BoxFactory

Buyer guides

Short, specific references on specifying cases and verifying the factories that make them. Written so a quotation can be compared against another quotation.

PP, ABS, HDPE or aluminium: choosing case material before you choose a supplier

Material decides which factories can even quote you. A short decision table with the trade-offs that actually cost money.

Updated 2026-11-12

How to vet a case manufacturer in China before you send a deposit

Ten checks that separate a factory that owns its tooling from a storefront reselling someone else’s catalogue — and what each answer means.

Updated 2026-11-12

IP ratings on protective cases: what the numbers mean and what a claim needs

IEC 60529 dust and water codes, why "waterproof" on a listing is not a rating, and the design details that decide whether a case keeps water out.

Updated 2026-11-12

OEM case programmes: tooling, lead times and what changes the schedule

The realistic sequence from a payload drawing to a shipped lot, and the three decisions that set your calendar.

Updated 2026-11-12

Designing the foam liner: the cheapest place to protect an expensive instrument

Material, density, layering and drawing handoff — the liner decisions that decide whether the payload arrives.

Updated 2026-11-12

EXW and FOB for case shipments: what each term makes you responsible for

Where the risk transfers, who books what, and the paperwork that gets containers held.

Updated 2026-11-12

Rotomoulding, injection or blow moulding: which process should your case use

The three case-forming processes have different cost curves, tolerance bands and failure modes. A short decision guide to settle before you request a quotation.

Updated 2026-11-13

Running a third-party factory audit on a case manufacturer

What to ask an inspection company to look at, what evidence to require, and how to read the result without over-trusting it.

Updated 2026-11-13

Case hardware: latches, hinges, gaskets and wheels, and what to specify

The small bought-in parts decide whether a good shell becomes a good case. A specification checklist for the components you do not mould yourself.

Updated 2026-11-13

Who owns the mould: exclusivity, custody and what happens when you stop ordering

The commercial terms around a case mould are usually vaguer than the technical ones. Five questions to settle before paying for tooling.

Updated 2026-11-13

From approved sample to delivered lot: writing an acceptance standard that holds

The document that decides a dispute is not the sample on your desk but the acceptance standard you signed before production.

Updated 2026-11-13

Ordering cases in volume: batching, production slots and quality over time

How a large case order should be split so that a problem costs you one pallet, not one container.

Updated 2026-11-13